-
EMPLOYER
Ykare Architecture
-
CONSTRUCTION AREA
7.500 m2
-
PERIOD
2018
-
BUILDING TYPE
Mixed Use
-
SERVICES
Electric-Mechanical
Emat Engineering successfully completed the lodging buildings project constructed by the General Directorate of Highways (KGM) in Hatay. Within the scope of the project, 120 lodging buildings were constructed. The lodgings were built in two different types, 2+1 and 3+1.
ㅤ
The lodgings are designed to offer a modern and comfortable living space. Each lodging has a kitchen, living room, bedroom, bathroom and toilet. Basic services such as internet and television connection are also available in the lodgings.
The project will significantly improve the quality of life of KGM personnel living in Hatay. The lodging houses offer all the necessary facilities for the personnel to live comfortably and peacefully with their families.
ㅤ
Emat Engineering used modern and high quality workmanship in the project. It made every effort to complete the project on time and within budget.